enLanguage

Application Of Multi-station Busbar Processing Machine

Aug 10, 2022Leave a message

The multi-station busbar processing machine is equipped with automatic oil filling and draining installation. The following is a brief description of the application problem:

Open the tool box, insert one end of the supplied oil filling and draining hose into the filling port, and put the other end into a new oil drum. Turn the switch to the filling level to stop the filling operation. Check the oil tank to avoid oil overflow. Stop refueling when full. When replacing with new oil (draining oil), first put the switch on the oil drain level, insert one end of the hose into the oil filling port, and put the other end into the waste oil container. According to this step, discharge the used hydraulic oil first, and then add the new hydraulic oil to the oil tank.


Pay special attention to the multi-station busbar processing machine:

When refueling the multi-station busbar processing machine, pay attention to keeping the oil drum, filling port and pipeline clean.

If the hydraulic pump is driven with insufficient hydraulic oil, the motor and hydraulic system will be damaged. Be sure to check the oil level before running the machine.

According to the operating conditions of the multi-station busbar processing machine, the hydraulic oil should be changed every six months if necessary. In high temperature, high humidity and dusty environments, it is necessary to shorten the oil change interval. If the hydraulic oil is not changed for a long time, it is easy to cause damage to the oil pump and hydraulic components. Please change the hydraulic oil in time.


The copper bar processing machine manufacturer reminds you that when installing the multi-station bus processing machine, please choose a spacious, clean and flat place, and pay attention to the following matters:

In the moving range of the material, avoid obstacles to avoid accidents.

The placement space of the equipment should be able to carry out maintenance, repair and other operations, and the height should be 1500mm higher than the machine.

Equipment power supply: three-phase four-wire system 380VAC+PE.50HZ. Be sure to make a reliable protective grounding and avoid placing it next to equipment that uses high current.

Working environment of multi-station busbar processing machine: the ambient temperature does not exceed 40 ℃, and the ambient humidity is 5-95% RH.

The installation of the bus leveling machine should also be paid attention to.


Send Inquiry

whatsapp

Phone

E-mail

Inquiry